How Precision MFG cut order processing time by 3.2×

A 400-person plant running on spreadsheets became a real-time operation — without stopping the line for a single day.

Precision MFG
Client
Manufacturing
Industry
16 weeks
Timeline
6 specialists
Team
The challenge

Every order at Precision MFG was re-keyed four times between sales, planning, production and dispatch. Stock counts drifted from reality within days, month-end close consumed three days of overtime, and the wrong variant shipped often enough to have its own nickname on the floor.

Two previous ERP attempts had failed — not for technical reasons, but because the software demanded the factory change to fit it. Operators quietly went back to paper both times.

The solution

We spent the first two weeks on the floor, mapping how work actually moved — including the unofficial workarounds that kept the plant running. The system we designed followed those paths instead of fighting them.

Sales orders now cascade automatically into production schedules and material requirements. Stations confirm work on rugged shared terminals with two-tap flows designed for gloved hands. Dispatch scans every carton against the order. Management watches live dashboards instead of demanding reports.

Process

How we got there

01

Floor immersion

Two weeks shadowing operators, planners and dispatch — mapping real flows, not org-chart flows.

02

Pilot cell

One production line ran the system for three weeks while the rest of the plant watched it work.

03

Module rollout

Inventory, then production, then dispatch — each module live and stable before the next.

04

Cutover & tuning

Legacy tools retired, dashboards installed on the floor, weekly tuning from live feedback.

Business results

What changed
for the client

3.2× Faster order processing
−68% Stock discrepancies
40 min Month-end close, was 3 days
0 days Production downtime during rollout
Laravel MySQL 8 Redis Alpine.js AWS EC2 Docker